The Terrace - Office Building Seismic Upgrade

In January 2016 we completed the seismic upgrade and fit-out of this 14-level office building. The main strengthening work involved drilling over 4500 reinforcing dowels to connect the new reinforced concrete skin.

The subsequent fit-out included a commercial kitchen.  As the building was tenanted, work was undertaken on a floor by floor basis.

 

Seismic upgrade  The Terrace Earthquake Strengthening